SB9 LOT SPLIT STEPS
Introduction:
The California Senate Bill 9 (SB 9) allows property owners to split a single-family residential lot into two separate lots and/or build additional housing units. The following are the key steps to legally subdivide a lot under SB 9 in Los Angeles:
Step 1: Confirm Eligibility
The property must be in a single-family residential (R1) zone or an equivalent low-density zone.
The lot must not be in an environmental hazard zone, flood zone, historic district, or protected wildlife corridor.
The owner must occupy one of the units as a primary residence for at least 3 years after the lot split.
Step 2: Conduct Feasibility Analysis
Lot Size Requirements: The original lot must be at least 2,400 square feet.
Subdivision Limitations: Each new lot must be at least 1,200 square feet and must be approximately equal in size (no lot can be smaller than 40% of the original size).
Utility Access: Check access to water, sewer, and electricity.
Setback Compliance: Ensure the new structures will comply with 4-foot rear and side setbacks.
Parking: At least one parking space per unit is required unless the lot is within ½ mile of public transit.
Step 3: Hire Professionals
Expeditor. To manage the process and communicate with city, to ensure legal compliance with zoning and property rights. Usually they work with:
Land Surveyor: To prepare an official parcel map.
Civil Engineer: For grading and drainage planning.
Architect/Designer: To create a compliant site plan.
Tree Arborist: To verify tree conservation
Environmental Assessment: To verify no habitat presence
Step 4: Prepare and Submit an SB 9 Lot Split Application
Submit the Urban Lot Split Application to the Los Angeles Department of City Planning.
The application typically requires:
Parcel Map (Tentative Tract Map)
Site Plans & Elevations
Zoning Clearance and Setback Compliance
Owner Affidavit stating primary residence commitment
Pay application fees (varies by location and project complexity).
Step 5: Review & Approval Process
The City of Los Angeles reviews the application within 60 days.
If additional documents or corrections are required, you may need to revise and resubmit.
Once approved, you will receive an official Certificate of Compliance.
Step 6: Record the New Parcels
File the Final Parcel Map with the Los Angeles County Recorder’s Office.
Pay recording fees and any associated property tax reassessments.
Step 7: Apply for Building Permits
File the Final Parcel Map with the Los Angeles County Recorder’s Office.
Pay recording fees and any associated property tax reassessments.
Step 8: Construction & Inspections
Start construction per approved plans.
Schedule mandatory inspections (foundation, framing, electrical, plumbing, final inspection).
Obtain a Certificate of Occupancy after the final inspection.
Additional Considerations
OA Restrictions: If the property is within an HOA, check for any restrictions.
Affordable Housing Restrictions: You cannot demolish or modify units currently occupied by tenants within the last 3 years or units designated as affordable housing.
Financing: If financing the project, confirm loan requirements for subdivided lots.
Conclusion: Simplifying SB 9 Lot Subdivision in Los Angeles
The SB 9 lot subdivision process in Los Angeles presents a great opportunity for homeowners and investors to maximize property value and create additional housing units. While the process involves multiple steps—eligibility verification, feasibility analysis, permits, and construction—proper planning and professional guidance can streamline the journey.
By following a structured approach and ensuring compliance with zoning laws and building regulations, property owners can successfully split and develop their lots. Whether your goal is to sell, rent, or build additional units, SB 9 offers a pathway to more efficient and sustainable urban development.